Pioneering

made easy

  • Home
  • Related Links
  • About us
  • Contact us

Bridges

  • Main Menu
  • Banana bridge
  • Breckland ditch dodger
  • Bridge-Climbing frame
  • Bushman's bridge
  • Derrick drawbridge
  • Drawbridge v1
  • Drawbridge v2
  • Fenland double lock bridge
  • Haymaker
  • Ladder bridge
  • Light pole bridge
  • Monkey bridge
  • Nyeri bridge
  • Portcullis drawbridge
  • Postman's bridge
  • Pylon bridge
  • Revolving derrick bridge
  • See-saw bridge
  • Simple ladder bridge
  • Single lock trestle bridge
  • Suspension bridge
  • Suspension bridge - simple
  • Suspension bridge (French)
  • Suspension bridge (Steve Buxton)
  • Swing bridge
  • Tassie
  • Transporter ladder bridge
  • Wayfarer bridge

Pioneering projects

Suspension Bridge - Simple

Equipment

- 4 x 5m (16ft) spars
- 2 x 3m (10ft) spars
- 4 x 2.5m (8ft) spars
- light spars for ladder rungs
- lashing lengths
- Long lengths of rope to span bridge and for rope ladder
- Large pegs or pickets

Method

Start by making a tripod on each side of the stream/gully using two 5m (16ft) spars and a 3m (10ft) spar that will be the back leg. The actual lengths of the spars will depend on the depth of the stream etc. Use either a figure of eight or a tripod lashing.

Lash horizontal spars across the long legs to form and A frame. They should be positioned so that they will be slightly higher than the bank when the legs are placed in their final positions.

Place the longer legs in the stream so that they have firm footings and are on line. Pull the shorter legs back until they are stable.

Drive a picket into the ground alongside and at right angles to the back spar and lash the two together.

The suspension rope can be tied off to the top of each tripod or a longer rope can be used and passed across the top of the tripod and tied off to the pickets.

A rope ladder the width of the stream is constructed and tied between the A frames. The centre span needs support from the top rope every metre or so.

Two short ladders using the 2.5m (8ft) spars are constructed and placed either side of the bridge, leaning on the cross spars of the A frame.

Fit a hand rope if found to be necessary

To download the complete plan and design document please Click here


Information

    If you would like a website created for your Business, Wedding, Special occasion please
    visit our web site for more information

Created by

  • www.idodesigns.co.uk

© copyright 2008 www.idodesigns.co.uk

  • Home : www.pioneeringmadeeasy.co.uk
  • Sitemap : available on request