Breckland Ditch Dodger

Equipment

  • approx 8 x 2.4m (8ft) spars
  • 2 x 1.8m (6ft) spars
  • 4 x 1.5m (5ft) stout pickets
  • 2 x 1.2m (4ft) stout pickets
  • 1 maul or sledge hammer

Method

Drive the pickets firmly into the ground in groups of 3 – 2 x 1.2m and 1 x 1.2m pickets. There should be 2 groups on each side of the ditch, at right angles to it. They should be approx, 1m (3ft) apart with the shortest stake in the centre.

Place the 1.8m (6ft) spars between the groups of pickets, resting on the centre, shorter picket.

Lay the 4m (12ft) spars across the ditch and on the 1.8m spars.

If necessary, brailing pegs can be tapped between the 4m spars to prevent them from moving.

Note: Since the design of the project the principles of Health and Safety have changed dramatically.
Caution should be exercised to assess the risks associated with this build and especially regarding possible falls from height, so handrails or belays and harnesses may be required.

To download the complete plan and design document please Click Here

Our Strategy to 2035

Place to belong

Our Strategy to 2035 will help us keep the focus on what we do best - giving young people a place to belong and giving them the skills to thrive.

Find out more
Strategy to 2035