Breckland Ditch Dodger

Equipment

  • approx 8 x 2.4m (8ft) spars
  • 2 x 1.8m (6ft) spars
  • 4 x 1.5m (5ft) stout pickets
  • 2 x 1.2m (4ft) stout pickets
  • 1 maul or sledge hammer

Method

Drive the pickets firmly into the ground in groups of 3 – 2 x 1.2m and 1 x 1.2m pickets. There should be 2 groups on each side of the ditch, at right angles to it. They should be approx, 1m (3ft) apart with the shortest stake in the centre.

Place the 1.8m (6ft) spars between the groups of pickets, resting on the centre, shorter picket.

Lay the 4m (12ft) spars across the ditch and on the 1.8m spars.

If necessary, brailing pegs can be tapped between the 4m spars to prevent them from moving.

Note: Since the design of the project the principles of Health and Safety have changed dramatically.
Caution should be exercised to assess the risks associated with this build and especially regarding possible falls from height, so handrails or belays and harnesses may be required.

To download the complete plan and design document please Click Here

Dwayne Fields proudly holds the title of the UK's 11th Chief Scout

An explorer, adventurer and TV presenter, Dwayne's been seen in BAFTA nominated Channel 5 series Race to the Pole, on BBC Springwatch, Countryfile, National Geographic and Disney+.

Find out more